The Sedge Grove project was the 2nd property Chris Milnes Building Contractors built for Tim & Claudia Smith and began on site in early 2010, with the build time taking approximately 8 months. The 4 bedroom property was built into the existing hillside using traditional building methods with a timber frame system for the two upper floors. We worked in close proximity with both the architects, and Mr & Mrs Smith themselves to achieve a spacious and contemporary property to their satisfaction.